✣ Your plan shelf

What Preppr returns to your program each year

Base case: estimated annual value $126,517, payback ~1 month, 5-year net $582,586.
Capacity + hard costs

Estimated annual value

$126,517
$121,818 staff time + $4,699 hard costs
vs. $10,000 subscription
Capacity + hard costs

5-year net

$582,586
$632,586 value vs. $50,000 cost
$1,165,172 net over 10 years · 12.7× value per dollar over 5 years
Capacity + hard costs

Payback

~1month
Inside year one.
$10,000 subscription ÷ $126,517 annual value
Readiness · not monetized

Plan elements validated

41of 72 · 57%
71 of 72 (98%) by year 5 · 72 of 72 (100%) by year 10
Unique plan elements in year 1. Readiness metric, not converted to dollars.
Capacity

Staff capacity returned

1,433.2hours
0.69 FTE at 2,080-hour year
Capacity returned to the mission, about 179 eight-hour workdays a year.
Readiness · not monetized

Gaps closed / actions tracked

7gaps closed per year
8 found · 36 closed over 5 years · 8 corrective actions opened per year
Readiness metric, not converted to dollars.

Your numbers

Change every number. Totals move with your inputs.

Preppr defaultpublished on preppr.ai todayPublic comparablea cited external figure, not your bidWorking estimatean adjustable starting point with no sourced inventory behind it

Larger programs raise these inputs: more plans, more elements per plan, more sessions.

Working estimate

A working estimate until you enter your own inventory.

plans
Working estimate

An element is a capability or core capability, role or position, critical task, procedure, resource, or decision point.

elements
Working estimate

The state- or doctrine-required annual exercise is typically 1.

sessions
Working estimate

With formal tabletops, the default facilitated cadence is 12 a year, well below the previous site default of 52.

sessions
Working estimate

A working estimate of how many plan elements one session puts to the test.

elements
Preppr default

Preppr site default. Replace it with your loaded rate. For context, the BLS May 2025 median wage for Emergency Management Directors is $44.87 an hour (wages only, not loaded). BLS source (opens in a new tab)

USD / hour

$126,517 a year$582,586 5-year net~1 month payback

One tile per plan element

12 sessions a year · 60 elements exercised

41of 72 plan elements validated by year 1

57% of your element inventory, counting each element once.

Readiness · not monetized

One tile per plan element: 6 plans × 12 elements.

8
gaps found a year
7
gaps closed a year
8
corrective actions a year
10
trainees overseen

Coverage approaching 100% does not mean the program is finished. Elements need to be re-exercised, and gaps and corrective actions continue each year.

Year-round individual SimOps practice (any seat, anytime) is additional use and is not included in hours or in the unique-element counts.

Set every assumption above and use your own numbers. Our defaults: $85 an hour, 85% of gaps close before the next cycle, Preppr removes 75% of design and reporting effort, and repeat sessions sometimes land on a plan element already validated.

Run your numbers with us

Details

Value stack, per year

Each hour and each contractor dollar is counted once. Rows are rounded; totals use exact values.

CategoryTraditional effort or costShare removedHours returnedAnnual $
1 · Planning assistanceCapacity40 hours a year · 50% other staff40 hours a year50% other staff20.0$1,700
2 · Tabletop design and deliveryCapacity1 × 24 hours · 75% design and reporting1 × 24 hours75% design and reporting18.0$1,530
3 · Simulation and trainingCapacity11 × 8 hours · 75% design and reporting11 × 8 hours75% design and reporting66.0$5,610
4 · Planning revisionsHard cost$23,497 over 5 years · 100% hard cost$23,497 over 5 years100% hard cost—$4,699
5 · DocumentationCapacity1 × 8 + 11 × 3 hours · 75% design and reporting1 × 8 + 11 × 3 hours75% design and reporting30.8$2,614
6 · Gap trackingCapacity8.4 gaps × 2 hours · 50% other staff8.4 gaps × 2 hours50% other staff8.4$714
7 · Training oversightCapacity10 × 2 hours · 50% other staff10 × 2 hours50% other staff10.0$850
8 · EOC exercise designCapacity4 × 250 hours · 80% EOC design4 × 250 hours80% EOC design800.0$68,000
9 · EOC after-actionCapacity4 × 160 hours · 75% design and reporting4 × 160 hours75% design and reporting480.0$40,800
10 · Players’ time in EOC seatsCapacity4 × 30 people × 5.5 hours · Same session length4 × 30 people × 5.5 hoursSame session length0.0$0
Capacity subtotalat $85 an hourat $85 an hour1,433.2$121,818
Total annual value$126,517

Sensitivity

Base case vs low case

The same model run twice. The low case swaps in lower values for eight inputs, on top of what you have entered.

MeasureBaseShowingLow
Hours returned a year1,433.2661.7
Staff time$121,818$56,245
Hard costs avoided$4,699$2,350
Estimated annual value$126,517$58,594
Payback~1 month~2 months
5-year net$582,586$242,971
10-year net$1,165,172$485,942
Capacity returned0.69 FTE0.32 FTE
Elements validated, year 141 of 7241 of 72
Gaps closed a year77

What the low case changes

  • Planning hours a year: 40 → 20
  • Tabletop design hours: 24 → 16
  • Short-session design hours: 8 → 6
  • Tabletop documentation hours: 8 → 6
  • Short-session documentation hours: 3 → 2
  • Hours per gap: 2 → 1
  • Oversight hours per trainee: 2 → 1
  • Contractor revision cycle: 5 → 10
  • EOC design hours: 250 → 100
  • EOC after-action hours: 160 → 80

Simulate Operations

One EOC exercise, today and with Simulate Operations

Simulate Operations removes 80% of the design and 75% of the after-action writing. People in EOC seats are valued at $75 an hour and staff at $85. Each exercise saves 320.0 hours, $27,200.

One EOC exerciseToday, hoursToday, costWith Simulate Operations, hoursWith Simulate Operations, cost
Design250.0$21,25050.0$4,250
After-action report and improvement plan160.0$13,60040.0$3,400
Controllers and evaluators44.0$3,74044.0$3,740
People in EOC seats, away from their day jobs165.0$12,375165.0$12,375
Total619.0$50,965299.0$23,765

4

EOC exercises a year

Today: one every 2 years

120

EOC seats exercised a year

Today: 15

320.0

Hours back per exercise

$27,200

165.0

Hours in EOC seats per exercise

$12,375 of players’ time

EOC exercise and seat counts are readiness metrics and are not converted to dollars. Players’ time counts as value only when a Simulate Operations session is shorter.

Details

Year by year, through year 10

Constant annual value, no inflation. Over 10 years: $1,265,172 value, $100,000 cost, $1,165,172 net. Years 1 and 5 and 10 are highlighted.

YearSubscriptionStaff timeHard costsTotal valueCumulative costCumulative valueCumulative netUnique elementsGaps found (cumulative)Gaps closed (cumulative)
1$10,000$121,818$4,699$126,517$10,000$126,517$116,51741 (57%)87
2$10,000$121,818$4,699$126,517$20,000$253,034$233,03459 (81%)1714
3$10,000$121,818$4,699$126,517$30,000$379,551$349,55166 (92%)2521
4$10,000$121,818$4,699$126,517$40,000$506,069$466,06969 (97%)3429
5$10,000$121,818$4,699$126,517$50,000$632,586$582,58671 (98%)4236
6$10,000$121,818$4,699$126,517$60,000$759,103$699,10372 (99%)5043
7$10,000$121,818$4,699$126,517$70,000$885,620$815,62072 (100%)5950
8$10,000$121,818$4,699$126,517$80,000$1,012,137$932,13772 (100%)6757
9$10,000$121,818$4,699$126,517$90,000$1,138,654$1,048,65472 (100%)7664
10$10,000$121,818$4,699$126,517$100,000$1,265,172$1,165,17272 (100%)8471

Accessibility and audit

How this is calculated

Every card, in words, with your current numbers.

Estimated annual value

Staff time = hours returned × hourly rate = 1,433.15 hours × $85 = $121,818.

Hard costs avoided = contractor cost ÷ years in the revision cycle × share avoided = $23,497 ÷ 5 × 100% = $4,699.

Annual value = staff time + hard costs = $121,818 + $4,699 = $126,517 ($126,517.15 before rounding), compared with a $10,000 annual subscription.

5-year net

5-year value = annual value × 5 = $126,517.15 × 5 = $632,586.

5-year cost = subscription × 5 = $10,000 × 5 = $50,000.

5-year net = value − cost = $582,586. Over 10 years: $1,265,172 − $100,000 = $1,165,172.

Value per dollar = 5-year value ÷ 5-year cost = 12.7×.

Payback

Payback = annual subscription ÷ annual value = $10,000 ÷ $126,517.15 = 0.08 years.

0.08 × 12 = 0.95 months, shown as ~1 month: inside year one.

Plan elements validated

Element inventory N = plans × elements per plan = 6 × 12 = 72.

Elements exercised k = sessions a year × elements per session × years = 12 × 5 × years (60 a year).

Unique elements = N × (1 − ((N − 1) ÷ N)^k), because repeat sessions sometimes land on an element that is already validated.

Year 1: k = 60, 40.89, shown as 41 of 72 (57%). Year 5: k = 300, 70.92, shown as 71 of 72 (98%). Year 10: k = 600, 71.98, shown as 72 of 72 (100%).

Coverage approaching 100% does not mean the program is finished. Elements need to be re-exercised, and gaps and corrective actions continue each year.

Staff capacity returned

Hours returned = the capacity categories, each multiplied by the share Preppr removes:

planning 40 × 50% = 20; tabletop design 1 × 24 × 75% = 18; simulation 11 × 8 × 75% = 66; documentation (1 × 8 + 11 × 3) × 75% = 30.75; gap tracking 8.4 × 2 × 50% = 8.4; training oversight 10 × 2 × 50% = 10; EOC exercise design 4 × 250 × 80% = 800; EOC after-action 4 × 160 × 75% = 480; players’ time 4 × 30 × (5.5 − 5.5) = 0.

Total = 1,433.15 hours, shown as 1,433.2.

FTE = hours ÷ full-time year = 1,433.15 ÷ 2,080 = 0.69 FTE, about 179 eight-hour workdays. This is capacity returned to the mission, not headcount.

Gaps closed / actions tracked

Gaps found a year = facilitated sessions × share that surface a gap = 12 × 70% = 8.4, shown as 8.

Gaps closed a year = gaps found × share closed = 8.4 × 85% = 7.14, shown as 7.

Over 5 years: 7.14 × 5 = 35.7, shown as 36. Over 10 years: 71.4, shown as 71.

Corrective actions opened a year = gaps found (one tracked action per gap) = 8.

Gaps and actions are readiness metrics and are not converted to dollars.

EOC exercises

One EOC exercise today = design 250 + after-action 160 + controllers and evaluators 8 × 5.5 + people in seats 30 × 5.5 = 619 hours, $50,965 (staff at $85, people in seats at $75 an hour).

With Simulate Operations = design 250 × (100% − 80%) + after-action 160 × (100% − 75%) + controllers and evaluators 8 × 5.5 + people in seats 30 × 5.5 = 299 hours, $23,765.

EOC exercises a year: 4 with Simulate Operations against one every 2 years today. EOC seats exercised a year: 120 against 15. Readiness metrics, not converted to dollars.

Disclosures

About these numbers

  • Change every number. Totals move with your inputs.
  • Staff time is capacity returned, not a claim about how many hours you currently spend.
  • Hard-cost dollars are not also counted as staff hours. Documentation and gap-tracking hours are not included in tabletop or SimOps design hours.
  • Plan elements, gaps, and trainees are readiness metrics and are not converted to dollars.
  • Individual, anytime SimOps practice is not included in the dollar totals or in unique-element counts.
  • FTE is capacity returned to the mission, not headcount you can cut.
  • The Nags Head figure is a 2023 public comparable for a small-town EOP-update task, not a quote to your organization.
  • Rounding: currency to the nearest dollar; unique elements and gaps displayed as whole numbers; hours to one decimal; FTE to two decimals. The math uses exact values, so rounded rows may not add up exactly to the totals.

Badges

  • Preppr defaultpublished on preppr.ai today
  • Public comparablea cited external figure, not your bid
  • Working estimatean adjustable starting point with no sourced inventory behind it
  • Badges show where each starting value comes from; an Edited chip marks a field you have changed.

Sources

ROI report

Create your report

Set it up, then download your numbers as a PDF or as editable PowerPoint slides to share with your team, leadership or council.

Format

A Letter-size document to print or share.

Case

Include

Always included: a plain-language summary, the six key figures, and About these numbers with its sources.

Your report is built in your browser. Nothing you enter here is sent to Preppr.