
✣ For hospitals & health systems
Two exercises.
Every year.
The CMS Emergency Preparedness Rule requires a testing program, and surveyors ask for the documentation. Preppr keeps your HVA and EOP connected, runs both exercises, and builds the record as you go.
42 CFR 482.15(d)
2
exercises a year for inpatient providers, at least one full-scale or functional.
✣ The compliance clock
The testing cycle surveyors check
CMS sets the cadence for reviewing and testing your emergency program. Joint Commission emergency management standards ask for the same evidence.
2/yr
Exercises for inpatient providers
One full-scale or functional exercise, plus a second exercise such as a tabletop.
1
Full-scale or functional
Community-based where possible, or facility-based when a community exercise is not available.
12 mo
Exemption after a real activation
An actual emergency that activates your plan can stand in for the next full-scale exercise.
2 yrs
Program review for hospitals
Review the risk assessment, plan, policies, communication plan, and training and testing program.
✣ When the surveyor asks
Every step leaves evidence
Preppr records each part of the cycle as it happens, so the documentation exists before anyone requests it.
Assess
Ask Preppr
Connects your HVA, EOP, and continuity plans against CMS elements.
✓ Gap register mapped to each CMS element
Gather intel
Intelligence
Brings hazard and threat signal into context with your plans and assessments.
✓ Threat picture linked to your hazards
Engage
Collaborate
Gathers input from clinical units, facilities, and coalition partners.
✓ Documented stakeholder input with dates
Design
Exercise & Simulation
Turns top-ranked HVA hazards into surge, utility, and cyber exercises.
✓ Exercise plan tied to your top hazards
Exercise
Exercise & Simulation
Runs the session in person or virtually, capturing decisions as they happen.
✓ Dated participant and decision log
Improve
Improve
Tracks corrective actions to closure and re-tests them next cycle.
✓ AAR/IP surveyors can follow
✣ Scenarios hospitals and health systems run in Preppr
Test the day you hope never comes
Surge
Mass casualty surge
Triage, bed capacity, staffing, and coalition patient movement.
Utilities
Loss of power or water
Backup systems, fuel, and continuity of patient care.
Cyber
EHR ransomware
Downtime procedures, manual charting, and diversion decisions.
✣ Inside Preppr
From your plans to a ready exercise
Exercise Designer reads your own plans and the rules your sector answers to, then drafts the scenario, injects, and objectives for your team to review.
app.preppr.ai

Keep your HVA, EOP, and coalition input current, meet CMS and Joint Commission testing, and close findings before surveyors ask.
How Preppr supports healthcare across the cycle
1 · Ask
Ask Preppr
Ask about your EOP and continuity plans and check them against CMS Emergency Preparedness Rule elements, cited to the page.
2 · Remember
Knowledge
Connect your HVA, EOP and continuity plans in one cited memory for the whole facility.
3 · Watch
Intelligence
Watch for surge, supply and cyber signals that affect your facilities.
4 · Engage
Collaborate
Gather input from clinical units, facilities and coalition partners in their own language.
5 · Practice
Exercise & Simulation
Turn top-ranked HVA hazards into surge, utility failure and cyber exercises, and run the two annual exercises in person or virtually.
6 · Improve
Improve
Produce AAR/IPs surveyors can follow, track coverage against CMS and Joint Commission requirements, and re-test corrective actions next cycle.
Requirements this covers
CMS Emergency Preparedness Rule
Two exercises per year for inpatient providers.
Joint Commission
Emergency management standards for accredited organizations.
Hazard vulnerability analysis
The all-hazards risk assessment that sets exercise priorities.
Scenarios teams test
Ransomware on the EHR
Mass-casualty surge
Utility failure and evacuation
Infectious disease surge
Supply-chain shortage
Active threat on campus
“Preppr is doing things that I could only dream of with my current methods. It’s accessible without deep technical skills or an array of AI tools.”
Jason Hoss
IT-DR Coordinator · Memorial Sloan Kettering Cancer Center
See it with your own plans.
A 30-minute demo built around your hazards and obligations.
Other sectors